[2016-NEW!] PassLeader Premium 70-695 Practice Test Ensure 100 Percent Exam Passing (Question 19 – Question 33)

Pass Mcrosoft 70-695 exam easily by learning PassLeader 70-695 dumps! PassLeader now are offering the newest 70-695 exam dumps, the PassLeader 70-695 braindumps contain all real 70-695 exam questions, 100% valid now! PassLeader now supply both 70-695 VCE dumps and 70-695 PDF dumps, which are really the best 70-695 study materials! Also, PassLeader offer free version VCE simulator. Welcome to get PassLeader 70-695 practice test!

p.s. Free 70-695 Exam Dumps Collection On Google Drive: https://drive.google.com/open?id=0B-ob6L_QjGLpUDE4Q0lsZDJoV2M (Explanation For Every Question Is Available!)

Case Study 3 -Litware, Inc. (QUESTION 19 -QUESTION 33)
Overview
General Overview
Litware, Inc. is an international manufacturing company that has 1,500 employees. Litware has a main office and a branch office. The main office is located in Montreal. The branch office is located in Seattle. The offices connect to each other by using a WAN link.
Network Configuration
The environment contains a production network and a development network. The two networks are isolated from one another. The networks use the addressing schemes shown in the following table.

Router interfaces are assigned the first IP address on each subnet.

Existing Environment
Active Directory
The network contains two Active Directory forests named litware.com and dev.litware.com. Each forest contains a single domain. The functional level of both forests is Windows Server2012 R2.
Management Infrastructure
Litware has a deployment of Microsoft System Center 2012 R2 Configuration Manager. On the production network in the Montreal office, Configuration Manager agents are installed on the client computers that run Windows 8.1 Enterprise. Configuration Manager is used only to deploy Windows updates. Operating systems are deployed either manually or by using Windows Deployment Services (WDS). Configuration Manager servers and WDS servers have the Microsoft Deployment Toolkit (MDT) 2013 installed Configuration Manager and MDT are integrated.
Windows Server and Client Environment
The network contains servers that run Windows Server 2012 R2. The network contains the client computers configured as shown in the following table.

The relevant servers in the production network are configured as shown in the following table.

The relevant computers on the development network are configured as shown in the following table.

Problem Statements
Litware identifies the following issues on the networks:
– IT administrators report that operating system deployment and license tracking of Windows 8.1 Enterprise are too labor intensive.
– Certain internally developed applications have compatibility issues with Windows 8.1 Enterprise.
CustomSettings.ini
CustomSettings.ini on Server201 and Server301 will contain the following information:

Requirements
Business Goals
As much as possible, Litware plans to minimize the costs associated with purchasing hardware and software.
Planned Changes
Litware plans to implement the following changes to the networks:
– On the production network, implement a Key Management Service (KMS).
– Deploy a Configuration Manager agent to all of the production network computers.
– On the production network, implement a Zero Touch deployment of Windows 8.1 Enterprise.
– On the production network, deploy Windows 8.1 Enterprise to all of the client computers that run Windows 7 Enterprise.
– On the development network, implement a Lite Touch deployment of Windows 7 Enterprise and Windows 8.1 Enterprise.
General Requirements
Litware identifies the following general requirements:
– Images deployed by using Configuration Manager and WDS must include Windows updates that are deployed already to the client computers.
– The installation of Microsoft Office 2013 on the production and development networks must include Outlook, Word, and Excel only.
– The deployed operating system must take full advantage of the hardware platform to which it is deployed.
– Network traffic to the Internet and WAN traffic between the offices must be minimized, whenever possible.
– Administrative effort must be minimized, whenever possible.
Production Technical Requirements
Litware identifies the following technical requirements for the planned deployments to the production network:
– Operating system deployments must include the latest Windows updates.
– All SQL Server instances must be Standard edition or Enterprise edition.
– Images copied between distribution points must NOT use any network bandwidth.
– The Microsoft Assessment and Planning (MAP) Toolkit must be used for all assessments of the client computers.
– Operating system deployments to the production network computers must use Configuration Manager integrated with MDT.
– Office 2013 must be deployed to the production network computers by using Microsoft Application Visualization (App-V).
– Server1 and Server101 must be used for operating system deployments and Windows update deployments to the production network computers.
– All Configuration Manager operating system deployment task sequences must be capable of using the settings configured in Customsettings.ini.
– The capture of reference images on the Configuration Manager servers must be implemented by using the build and capture a reference operating system image task sequence.
Development Technical Requirements
Litware identifies the following technical requirements for the planned deployments to the development network:
– When reinstalling computers on the development network, the user state of the administrator account and the local accounts must not be captured. The user state of all other accounts must be captured.
– Application compatibility issues of internally developed applications must be identified by monitoring the execution of each application on the Windows 8.1 Enterprise computers.
– Server201 and Server301 must be used for operating system deployments to the development network computers by using WDS integrated with MDT.
– All new systems on the development network must run Windows 7 Enterprise x86/x64 or Windows 8.1 Enterprise x86/x64.
– Office 2013 must be deployed to the development network by using Windows Installer (MSI) package-based installations.
– All computers deployed to the development network must be periodically reinstalled.

QUESTION 19
You need to recommend a solution to automate the deployment of Office 2013 on the development network computers. Which two actions should you include in the recommendation? Each correct answer presents part of the solution.

A.    Modify the Setup.xml file in the ProPlus.ww folder.
B.    Create a network installation point.
C.    Run setup.exe and specify the/download parameter.
D.    Run setup.exe and specify the /admin parameter.
E.    Download the Office Deployment Tool.

Answer: BD

QUESTION 20
Drag and Drop Question
You need to recommend a procedure to identify the compatibility issues of the internally developed applications. Which three actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

QUESTION 21
Drag and Drop Question
You need to prepare Server2 to perform a Windows 8.1 readiness assessment of the production network computers. Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

QUESTION 22
Hotspot Question
You need to identify which licensing keys must be used for the client computers. Which licensing keys should you identify for each network? To answer, select the appropriate licensing key for each network in the answer area.

Answer:

QUESTION 23
You need to identify which step must be included in all of the operating system deployment task sequences created on Server1. Which step should you identify?

A.    Validate
B.    Set Task Sequence Variable.
C.    Gather
D.    Use MDT Package.

Answer: D

QUESTION 24
Drag and Drop Question
You need to recommend a procedure for capturing a reference image from the production network. Which three objects should you recommend be created in sequence? To answer, move the appropriate objects from the list of objects to the answer area and arrange them in the correct order.

Answer:

QUESTION 25
Hotspot Question
You need to identity the minimum number of boot images required for the operating system deployment to the production and development networks. How many images should you identify? To answer, select the appropriate number of images for each boot image type in the answer area.

Answer:

QUESTION 26
Hotspot Question
You are evaluating CustomSettings.ini. Use the drop-down menus to select the answer choice that completes each statement.

Answer:

QUESTION 27
Hotspot Question
You need to identify which executable and which parameter must be used to meet the technical requirements for the development network. Which executable and parameter should you identify? To answer, select the appropriate executable and parameter in the answer area.

Answer:

QUESTION 28
Drag and Drop Question
You need to configure an unattended file for operating system deployments from Server201 and Server301. Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

QUESTION 29
You need to use Configuration Manager to deploy operating systems to the production network. The solution must meet the technical requirements. Which two actions should you perform? Each correct answer presents part of the solution.

A.    Add an operating system image.
B.    Run the Create Automatic Deployment Rule Wizard.
C.    Add an operating system installer.
D.    Run the Create Task Sequence Wizard.
E.    Run the Schedule Updates Wizard.

Answer: AD

QUESTION 30
Hotspot Question
You need to identify which actions must be performed to distribute the boot images from Server1 to Server101, once Server101 is configured as a distribution point. What should you identify? To answer, select the appropriate server to perform each action in the answer area.

Answer:

QUESTION 31
Drag and Drop Question
You need to recommend a procedure for configuring the deployment of Office 2013 on the production network. Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

QUESTION 32
Drag and Drop Question
You need to prepare Server1 and Server101 for an operating system deployment. What should you configure on each server? To answer, drag the appropriate actions to the correct servers. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

Answer:

QUESTION 33
You need to recommend a procedure for applying Windows updates to the operating system images stored in WIM files on the development network. What should you include in the recommendation?

A.    Approve-WsusUpdate with the -Update parameter
B.    Add-WindowsPackage with the -Online and -PackagePath parameters
C.    Add-WindowsPackage with the -Path and -PackagePath parameters
D.    Msiexec with the /p and /q parameters

Answer: C


Download the newest PassLeader 70-695 dumps from passleader.com now! 100% Pass Guarantee!

70-695 PDF dumps & 70-695 VCE dumps: http://www.passleader.com/70-695.html (105 Q&As) (New Questions Are 100% Available and Wrong Answers Have Been Corrected! Free VCE simulator!)

p.s. Free 70-695 Exam Dumps Collection On Google Drive: https://drive.google.com/open?id=0B-ob6L_QjGLpUDE4Q0lsZDJoV2M (Explanation For Every Question Is Available!)